萧山发电厂系浙江省“八.五”重点建设工程,电厂从1993年和1994年建成投产发电的一期两台125兆瓦国产燃煤机组,到2008年1月投产的二期工程两台350兆瓦级燃气蒸汽联合循环机组,再到目前正在建设中的三期390兆瓦燃气—蒸汽联合循环热电联产机组,萧山电厂从“八五”到“十二五”开局之年,机组容量从建设之初的250兆瓦增到现在的1450兆瓦,机组容量是原来的5.8倍,职工人员反而下降了1/3,但企业安全生产日却突破4200多天,利润不断创新高,企业效能明显。
Xiaoshan Power Plant in Zhejiang Province “eight five” key construction projects, power plants built from 1993 and 1994 put into operation a two 125 MW coal-fired units to January 2008 put into operation the second phase Two 350 MW gas-steam combined cycle units and the third phase 390 MW gas-steam combined cycle combined heat and power unit currently under construction. The Xiaoshan Power Plant is under construction from the “1985” to the “Twelfth Five-year” "Beginning of the year, unit capacity from the beginning of the construction of 250 MW to the present 1450 MW, the unit capacity is 5.8 times the original, but staff declined by 1/3, but the enterprise safety day but exceeded 4200 days , Profits continue to record high, corporate efficiency is obvious.