紫坪铺水利枢纽1#导流隧洞在导0+88.0~0+123.0m段上导洞开挖施工中,由于该段处于煤洞及煤洞塌方体、软弱体段,岩体软弱、破碎、支撑力小,致使洞壁变形、裂缝、塌方。在施工中,采取了超前固结灌浆、超前锚杆或管棚稳定掌子面,混凝土回填煤洞,以及系统锚杆、喷钢纤维混凝土、钢支撑(格栅钢架)及混凝土加强肋等紧跟掌子面强支护的措施。
During the excavation of the guide tunnel at the section 0 + 88.0 ~ + 123.0m in No.1 diversion tunnel of Zipingpu Water Conservancy Project, the section is located in the cave body and the weak part of the coal tunnel, the weak and broken rock mass, Support force is small, resulting in deformation of the cave wall, cracks, landslides. In the construction, advanced consolidation grouting, advanced anchor or pipe roof stable face, concrete backfill coal tunnel, and system anchor, steel sprayed steel fiber reinforced concrete, steel support (grid steel frame) and concrete reinforcement rib Follow the face strong support measures.