【摘 要】
:
本文以笔者所在院校及本地区民族预科学生数据为基础,阐述了目前民族预科生教育、教学和职业规划的基本现状及问题,并在此基础上探讨了职业院校民族预科生职业生涯规划体系建
论文部分内容阅读
本文以笔者所在院校及本地区民族预科学生数据为基础,阐述了目前民族预科生教育、教学和职业规划的基本现状及问题,并在此基础上探讨了职业院校民族预科生职业生涯规划体系建设的相关建议,以此为职业院校民族预科生的职业规划提出建设意见和思考。
Based on the data of the college and the national preparatory students in our country, this paper expounds the current situation and problems of the education, teaching and career planning for pre-graduates in our country. On the basis of this, the paper discusses the career planning of pre-university students in vocational colleges System construction of the relevant recommendations, as a vocational college national preparatory career planning put forward suggestions and thinking.
其他文献
李家峡水电站位于青海省东南部,距上游龙羊峡水电站约为108.6km,是黄河上游重点工程之一.坝址区两岸山势陡峻,河谷狭窄,枯水期水面宽约30~50m.河床复盖层一般厚为3~9m,坝基基岩
Interaction has been considered as a significant contributor to second language acquisition.Drawing on Long’s Interaction Hypothesis,this paper mainly discusse
一闽语的-VGC结构1.闽语中的-VGC,指“韵核+滑音+辅音韵尾”结构。以闽东方言为例,福州话里有“咸”[kεiη]、“糠”[k′ouη]、“重”(不轻)[t?yη]、“笔”[pei]、“角
“一锅饭吃了十个人”是现代汉语中比较特殊的一种句结构。其线性结构符合汉语的SVO结构,然而其主语和宾语的语义角色关系跟其所处的位置截然相反。本文认为该句和“一张床睡
潘家口水电站一号水轮机系东方电机厂制造,型号为HL220—LJ550混流式水轮机。主要参数为: 设计水头:63.5米最高水头:85米最低水头:36米额定功率:154000千瓦设计流量:277米~3
当滑坡体滑动面为折线形且出现顺逆转折或逆坡滑动的情况下,利用通常所介绍的滑坡推力计算公式来计算滑坡推力时,不很方便。本文着重对该情况下滑坡推力之计算方法进行了探讨
小型水电站群的装机容量选择,是一个比较复杂的技术经济问题。它对水能资源的合理开发、小水电的经济效益和建设资金的合理使用等方面影响极大。本文试图用边际成本分析法来
本文对小清河口的水文气象特征、沿海水动力条件、泥沙淤积分布和延伸造陆情况以及历史变迁等问题进行了阐述,指出河口三角洲的淤积延伸、口门阻塞、河道缩窄、水深变浅、排
在泄洪洞内设多级孔板消能是一种新型消能型式。鉴于国内外尚缺乏这类型式消能的实际工程经验,决定选择碧口水电站排沙洞增建孔板进行现场消能试验,通过试验取得了有关孔板消
我国在水利科学研究中采用室内试验、原型观测和理论分析(包括数值模拟或数学模型)三结合的办法.在这里提出加快发展数学模型是为了加强薄弱环节,而不是主张背离三结合的方法