论文部分内容阅读
这是一个常见的题目:机床厂加工一批机床,计划每天加工120台,6天可以完成任务。但由于工人的积极性高,实际用5天就完成了任务。实际每天比原计划多加工多少台?老师也讲过一个常见的解法,同学们都这样计算:先求出这批机床一共的台数是120×6=720(台);再求出实际每天加工的台数是720÷5=144(台);最后求出实际每天比原计划多加工的台数是144-120=24(台)。
This is a common topic: A batch of machine tools is machined by a machine tool factory, with a planned daily processing capacity of 120 units, which can be completed in 6 days. However, due to the enthusiasm of the workers, the task was actually completed in 5 days. The actual daily number of more than the original plans to process? Teachers also talked about a common solution, the students are so calculated: first find the total number of these machines is 120 × 6 = 720 (Taiwan); and then find the actual daily processing The number of units is 720 ÷ 5 = 144 (units). Finally, the actual number of units processed per day is 144-120 = 24 (units).