本文通过介绍预制梁场现场布置和规划特点,分析了由于高速铁路客运专线预制梁场规划建设施工有战线长、施工现场地形复杂以及数量大等不利因素。此外占地广、工期长、成本高、设备周转期长等问题也亟待解决,从而确定如果进行梁场的预制规划,则可以大量生产梁板来克服一系列不利因素,还能达到降低成本的目的。
In this paper, by introducing the characteristics of site layout and planning of prefabricated beam field, it is analyzed that because of the construction of prefabricated beam field in passenger dedicated railway line, there are many disadvantages such as long construction battlefield length, complex terrain and large number of construction site. In addition, such issues as wide coverage, long construction period, high cost and long equipment turnaround time also need to be solved urgently so as to determine if the prefabricated plan of the beam yard can be manufactured in large quantities to overcome a series of unfavorable factors and reduce the cost purpose.