论文部分内容阅读
In order to improve the quality of the strip for the hot continuous rolling, the high accuracy set-up control must be applied toproduction.In the paper, we analyze the PFC (profile and flatness control)system and simulate the set-up process.Calculationresults are in agreement to the actual measurements.It is the basis on the developing model.
In order to improve the quality of the strip for the hot continuous rolling, the high accuracy set-up control must be applied top production. In the paper, we analyze the PFC (profile and flatness control) system and simulate the set-up process. Calculation results are in agreement to the actual measurements. It is the basis on the developing model.