基于多自由度激光堆积金属零件中心轴线的搜寻算法

来源 :激光杂志 | 被引量 : 0次 | 上传用户:leongiggs
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
针对激光堆积制造金属零件中存在支撑结构去除困难、浪费材料及辅助加工时间长等不足。为此基于多自由度无支撑激光堆积制造金属零件系统被广泛研究。物体中心轴线是激光堆积制造金属零件过程中堆积方向及堆积层厚度分割确定的依据。本文提出了一种金属零件中心轴线搜寻的具体算法,该算法主要依据金属零件的几何特征,来确定金属零件的中心轴线。利用该算法能够较为简单的确定金属零件的中心轴线。金属零件中心轴线的提取,为实现无支撑激光直接制造金属零件系统的开发提供基础。 There are some shortcomings such as the difficulty of removing the support structure, the waste of materials and the long time of auxiliary processing in the manufacturing of laser metal parts. For this reason, the fabrication of metal parts based on multi-degree freedom unsupported laser deposition has been studied extensively. The center axis of the object is the basis for determining the stacking direction and the thickness of the sedimentary layer in the process of manufacturing the metal parts by laser deposition. In this paper, a specific algorithm for searching the center axis of a metal part is proposed. The algorithm mainly determines the center axis of a metal part based on the geometric characteristics of the metal part. The algorithm can be used to determine the center axis of the metal parts relatively easily. The extraction of the center axis of the metal parts provides the basis for the development of the metal parts system for the unsupported laser directly.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
永煤集团城郊煤矿北一风井净直径 5 0m ,井筒设计总长度 436m。井筒穿过冲积层厚 36 4 4m ,主要由砂质粘土和粘土组成 ;穿过基岩风化带厚 33 6m ;穿过完整基岩厚 38 0m ,岩
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
在现代化社会发展的背景下,我国对于交通方面的建设要求越来越高,因此,想要进一步提高公路安全方面的问题,就要在公路工程建设中引用先进技术,同时也要对公路工程管理方面的
期刊
经济的发展,城镇化进程的加快,促进交通建设项目的增多.预应力技术作为路桥施工中的关键技术,对其进行高效应用有助于路桥工程结构的优化,有助于提升路桥工程整体的安全可靠
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊