论文部分内容阅读
概述了沈阳市地铁二号线五里河站的施工方案,同时介绍了其主体围护结构方案的确定和地下连续墙围护结构的计算方法。
The construction plan of Wulihe Station of Shenyang Metro Line 2 is summarized. The scheme of main enclosure structure and the calculation method of retaining wall of diaphragm wall are introduced.