房间空调器试验室(以下称试验室)是国家技术监督局于1987年下达我所的研制建造任务。 在所领导及技改办的指导协调下,由十多个工程技术人员经过前后三年多的努力于1990年五月基本完成了设计、施工、安装、调试工作。又经过2000多小时长期负载运行后于1990年8月中旬和1991年2月分别通过了所内工程验收、所级验收评审。紧接着于1991年3月19日由国家技术监督局、轻工部、机电部等十一个单位十二名专家组成的验收鉴定委员会对该试验室进行了认真、严格、细致的审查,抽测后正式通过了国家级验收和部级技术鉴定。
The room air conditioner laboratory (hereafter referred to as the laboratory) is the development and construction task assigned by the State Bureau of Technical Supervision in 1987. Under the guidance and coordination of the leadership and the technical reform office, more than a dozen engineers and technicians completed the design, construction, installation and commissioning work in May 1990 after more than three years of hard work. After more than 2,000 hours of long-term load operation, it passed the acceptance inspection and the acceptance evaluation at the same level in the mid-August 1990 and February 1991 respectively. Immediately after March 19, 1991, the acceptance appraisal committee, consisting of 12 experts from 11 agencies including the State Technical Supervision Bureau, the Ministry of Light Industry, and the Electromechanical Department, conducted a serious, rigorous, and meticulous examination of the laboratory. After the formal adoption of the national acceptance and ministerial level technical appraisal.