论文部分内容阅读
中外瞩目的长江三峡水利枢纽工程,自开工以来创出了多项世界之最,而且攻克了一道又一道的水工建筑史上少有的世界级难题,在进入主体工程浇筑和设备安装为主要内容的第二期(施工第二阶段)工程高强度施工阶段后,又不断刷新世界水电工程开挖和浇筑量的世界纪录,因而也受到中外坝工专家的诸多关注和称赞。目前,三峡工程建
The Three Gorges Project, the focus of attention of both China and foreign countries, has hit many world tops since its commencement of operation and has overcome the rare world-class problems one after another in the history of hydraulic construction. As the main content of pouring and installation of equipment into the main project After the high-intensity construction phase of the second phase of the project (the second phase of construction), the world record of the excavation and pouring volume of the world’s hydropower projects has been continuously refreshed. Therefore, it has also received much attention and praise from dam experts both at home and abroad. At present, the Three Gorges Project was built