Upgradation of bauxite by molecular hydrogen and hydrogen plasma

来源 :International Journal of Minerals Metallurgy and Materials | 被引量 : 0次 | 上传用户:Rainwave
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
An approach was developed to upgrade the bauxite ore by molecular hydrogen and hydrogen plasma. A gibbsite-type bauxite sample was obtained from National Aluminium Company(NALCO), Odisha, India. The obtained sample was crushed and sieved(to 100 μm) prior to the chemical analysis and grain-size distribution study. The bauxite sample was calcined in the temperature range from 500 to 700°C for different time intervals to optimize the conditions for maximum moisture removal. This process was followed by the reduction of the calcined ore by molecular hydrogen and hydrogen plasma. Extraction of alumina from the reduced ore was carried out via acid leaching in chloride media for 2 h at 60°C. X-ray diffraction, scanning electron microscopy, thermogravimetry in conjunction with differential scanning calorimetry, and Fourier transform infrared spectroscopy were used to determine the physicochemical characteristics of the material before and after extraction. Alumina extracted from the reduced ore at the optimum calcination temperature of 700°C and the optimum calcination time of 4 h is found to be 90% pure. An approach was developed to upgrade the bauxite ore by molecular hydrogen and hydrogen plasma. A gibbsite-type bauxite sample was obtained from National Aluminum Company (NALCO), Odisha, India. The obtained sample was crushed and sieved (to 100 μm) prior to the chemical analysis and grain-size distribution study. The bauxite sample was calcined in the temperature range from 500 to 700 ° C for different time intervals to optimize the conditions for maximum moisture removal. This process was followed by the reduction of the calcined ore by Molecular hydrogen and hydrogen plasma. Extraction of alumina from the reduced ore was carried out via acid leaching in chloride media for 2 h at 60 ° C. X-ray diffraction, scanning electron microscopy, thermogravimetry in conjunction with differential scanning calorimetry, and Fourier transform infrared spectroscopy were used to determine the physicochemical characteristics of the material before and after extraction ore at the optimum calcination temperature of 700 ° C and the optimum calcination time of 4 h is found to be 90% pure.
其他文献
介绍了地铁电传动打磨车车轴齿轮箱的技术参数和关键设计,并阐述了其结构特点和试验情况。经台架试验和装车考核情况验证,齿轮箱密封可靠、散热良好、运行平稳,达到设计要求,
In this study, citric acid was used as a dispersant to improve the flotation performance of hematite fines. The effect and mechanism of citric acid on the rever
传统交流配电系统正面临着供电走廊紧张、供电能力不足和设备开断能力不能满足大容量需求等一系列问题.同时,含有直流的交直流配电网在输送容量、可控性以及提高供电可靠性等
A thermodynamic analysis of the carbothermic reduction of high-phosphorus oolitic iron ore(HPOIO) was conducted by the Fact Sage thermochemical software. The ef
多媒体通信是近几年发展起来的一门新兴通信技术.本讲座主要介绍了多煤体通信技术的基本概念、特征.并着重讨论了多媒体通信所涉及的信息处理技术、网络技术、终端技术、同步
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
在电力系统变电站的设备运维管理工作中,加强设备检修和维护的定期管理是非常重要的工作内容.当前变电站的维护,方法是依据不同的设备运行情况有针对性的展开的,主要工作原则