A new method of LES verification and validation for attached turbulent cavitating flow

来源 :水动力学研究与进展B辑 | 被引量 : 0次 | 上传用户:pjkxqx
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The large eddy simulation (LES) is used to resolve the flow structure in the cavitating turbulent flow around the Clark-Y hydrofoil coupled with a homogeneous cavitation model. A new method is proposed in this paper to calculate the LES error of the time-averaged streamwise velocity for the LES verification and validation (V&V). From the instantaneous cavity patterns, it is demonstrated that the predicted results agree fairly well with the experimental data. With this new proposed method, the LES errors can be easily and effectively calculated with a limited mesh number, and the method might be used in the other applications of the LES V&V. Results of the LES errors obtained by the new method show that the relatively steady flow can be simulated with small errors, while the complex flow structures at the cavity shedding region might lead to an increase of errors in the LES modeling. In addition, the distributions of the resolved Reynolds stresses are used to estimate the influences of the cavitation on the turbulent fluctuations. Results indicate that the turbulent fluctuations for the cavitating flow are much larger in magnitude as compared to the cases without cavitation.
其他文献
The flocculation and the settling of the cohesive sediment play an important role in the sediment transport process, and they are affected by many factors. On t
The destabilization of an erodible sediment bed by a reproducible impulsive phenomenon is studied experimentally.For this,a specific setup is designed to produce a well-controlled isolated vortex,advected over a uniform sand bed.Particle image velocimetry
Viewed as sinews and muscles of fluid motion, coherent vortical structures with their interactions are key to understanding the flow dynamics. Based upon this o
Dear Colleagues,rnI am delighted to announce the 2nd International Symposium of Water Disaster Mitigation and Water Environment Regulation (WDWE2021), to be hel
期刊
文章论述了白云湖水库区域水资源状况及开发利用程度,并对其取用水的可靠性与可行性进行分析。结果表明:白云水库工程向供水区供水是可行的,水源是可靠的,水量、水质均满足供水要求。
根据泗河新工况的变化,结合自身多年实践经验,提出了新形势下泗河在运行管理方面的初步构想,并对远期进行了展望,力求达到防洪安全、生态安全和其它客体的和谐统一,具有一定的指导意义。
The drag and side force coefficients of a half-submerged cylinder in a free-surface flow were calculated through numerical simulations, with the aim of supporti
简介放射性定量伽玛测井、放射性地面γ能谱测量和岩芯、岩石和水样品实验室测试和水氡及氡气析出率测量等工作方法,通过在新疆某引水工程的实际应用查明引水隧洞沿线放射性核素含量水平,分析调查区铀、钍、钾放射性核素、伽玛照射量率、水中放射性核素分布情况,对调查区内施工隧洞的开挖岩石和围岩放射性情况进行评价。
从嘉祥县河湖现状出发,阐述了嘉祥县全面实行河长制取得的成效,分析了河长制推进过程中存在的主要问题,针对问题提出了合理化建议,以期为今后扎实推进河长制工作提供参考。
从组织体系构建、制度建立、信息化建设、方案编制、岸线管理和长效管护六个方面阐述了滨州市河长制的发展历程.在此基础上,全面总结以“治理污水、整治八乱、控水节水、生态