论文部分内容阅读
从工程实践出发,论证了二滩高拱坝挑流消能修建水垫塘的重要性,探讨了在设计水垫塘过程中,针对不同问题所采取的各种工程措施
Based on the engineering practice, this paper demonstrates the importance of the Ertan high arch dam for energy dissipation in the construction of a plunge pool and discusses various engineering measures for different problems during the design of the plunge pool.