天荒坪抽水蓄能电站输水系统充排水试验

来源 :水力发电 | 被引量 : 0次 | 上传用户:beautyfox110
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
天荒坪抽水蓄能电站1号上游输水系统是我国目前水头最高的大直径水工隧洞,一洞三机式布置,承受的最大静水头为680m,充水分7个阶段进行,第1~第5阶段充水速率为10m/h,第6、7阶段各分2个小台阶,充水速率为5m/h。排水分3个阶段,采用压力表和压力变送器共同监测水道内水压力。由于采取的充排水程序合理、措施得当,充排水试验获得了成功,水道设计、施工、安装质量经受住了初步考验。 Tianhuangping Pumped Storage Power Station No. 1 upstream water delivery system is China’s current head of the largest diameter hydraulic tunnel, a hole three-machine layout, the maximum static head to withstand 680m, filled with water at seven stages, The 5th stage water-filling rate is 10m / h, the 6th and 7th stages are divided into 2 small steps, and the water-filling rate is 5m / h. Drainage in three stages, the use of pressure gauges and pressure transmitters together to monitor water pressure within the channel. Due to the reasonable filling and draining procedures, the proper measures and the successful drainage and drainage tests, the water channel design, construction and installation quality have withstood the initial test.
其他文献
<正>运动营养与体重管理之间的界限是模糊的。极限型运动员仅仅是不断扩大的运动营养市场中的一小部分,而追求健康生活的个体所覆盖的范围能横跨从活跃的健身爱好者到临床意
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
据中国商务部网站15日消息,商务部日前下发通知,要求各地商务主管部门做好婴幼儿配方乳粉药店专柜销售试行工作,加强婴幼儿配方乳粉流通行业管理,保障流通环节婴幼儿配方乳粉质量
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
一、平原石榴的生产环境及特点 平原石榴生长在相对土层深厚、肥水充足、气候温和、光热资源丰富的环境内,其枝条形成量大、长桂多、短枝少、枝叶茂盛、成冠快、结果晚、完
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊