论文部分内容阅读
桥梁工程是我国基础建设工程中的重要组成部分,随着社会经济的发展及科学技术的不断进步,对建筑工程的技术和质量提出了更高的要求。近年来,我国跨区域路桥建设规模不断增大,大型桥梁工程逐渐增多,桥梁水下混凝土灌注桩施工日益成为桥梁工程的重难点问题。如何在确保桥梁施工进度和质量的前提下,提高桥梁水下混凝土灌注桩施工技术,已成为现代桥梁工程必须面临的问题。只有在施工过程中加强重视,对桥梁水下混凝土灌注桩施工技术进行深入研究,才能确保水下混凝土灌注桩施工质量,进而为大型桥梁的整体质量和使用性能提供强有力保障。本文主要对桥梁水下混凝土灌注桩施工技术进行研究。
Bridge engineering is an important part of China’s infrastructure construction. With the development of society and economy and the continuous improvement of science and technology, the bridge engineering put forward higher requirements on the technology and quality of construction engineering. In recent years, China’s cross-regional road and bridge construction continues to increase the scale of large-scale bridge project is gradually increasing, the construction of underwater concrete bored piles bridge construction increasingly become a heavy and difficult problem. How to improve the construction technology of underwater concrete bored piles under the premise of ensuring the progress and quality of bridge construction has become a problem that modern bridge engineering must face. Only in the construction process to strengthen the emphasis on the bridge underwater concrete pouring pile construction technology in-depth study in order to ensure the quality of underwater concrete pouring pile construction, and thus for the overall quality of large bridges and the use of performance to provide a strong guarantee. This paper mainly studies the construction technology of the bridge underwater concrete pouring pile.