地下工程后对接法施工工艺

来源 :建筑工人 | 被引量 : 0次 | 上传用户:bassdd
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
本工程位于山东省菏泽市,先期建设的高层住宅地下室结构已施工完成,后增加连体地下车库,车库与高层住宅地下室结构需增设逃生通道,因高层住宅地下室结构已施工完成,且未给新增车库预留任何防水接口措施,现需在高层住宅地下室结构的外墙处进行事后开孔,设置为消防使用的逃生通道连接两座地下建筑,工程技术难点在于解决两座建筑的防水对接问题,且没有同类工程实践经验可借鉴参考。 The project is located in Heze City, Shandong Province. The prefabricated high-rise residential basement structure has been completed and the escape tunnel has been added after the construction of the basement of the underground garage, garage and high-rise buildings. As the basement structure of the high-rise residential house has been completed and has not been newly constructed Increased garage Reserved for any waterproof interface measures, it is required in the high-rise residential basement structure of the outer wall at the post-opening, set to fire escape routes used to connect two underground buildings, engineering and technical difficulties is to solve the two buildings waterproof docking problem , And no similar engineering practice can learn from reference.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊