论文部分内容阅读
In order to recover ore as much as possible, a computer-controlled truck real-time dispatching model is conducted under the conditions of Qidashan lron Mine. It can not only acquire the optimization of shovel and truck operation, but also satisfy requirements of blending ores.The simulation results indicate the effectiveness of the model developed.
It can not only acquire the optimization of shovel and truck operation, but also the requirements of the blending ores The simulation results indicate the effectiveness of the model developed.