以上海市污水治理白龙港片区南线东段干管工程为例,介绍了工程质量控制难点及特点,从超大直径管节质量保证措施、超长顶距顶管施工质量控制措施等方面,总结出相关技术质量控制措施,并对实施效果进行了分析。
Taking the project of trunk pipe in the east section of Bailonggang section of Shanghai sewage treatment as an example, the difficulties and characteristics of project quality control are introduced. From the aspects of quality assurance measures of super-large diameter pipe sections and construction quality control measures of over- Summed up the relevant technical quality control measures, and carried out an analysis of the implementation effect.