介绍了下霍矿井一采区带式输送机的设计思路,考虑到在投产初期,该带式输送机存在下运工况,后期还要向后延长,并有可能出现电动机功率为正功率的工况,因此设计时采用铺设阻尼板方法,以抵消其下运时产生的倾斜阻力,并合理布置驱动单元的位置,同时兼顾考虑带式输送机前后期的驱动配置,为带式输送机的设计选型提供参考。
The design idea of a belt conveyor in the first mining area of Xiahuo Mine is introduced. Considering that the belt conveyor has the lower working condition in the initial stage of production, the latter has to be lengthened later, and the motor power may be positive Therefore, the method of laying damping plate is adopted to counteract the sloping resistance generated when it is transported and the position of the driving unit is reasonably arranged. At the same time, the drive configuration of the belt conveyor should be taken into consideration both in the front and the back of the belt conveyor. Design selection for reference.