【摘 要】
:
1985年5月25日至29日,水利水电建设总局会同中国水力发电工程学会金属结构专业委员会在富春江水工机械厂,主持召开了关于龙羊峡水电站泄洪底孔平面链轮事故检修闸门和偏心铰
论文部分内容阅读
1985年5月25日至29日,水利水电建设总局会同中国水力发电工程学会金属结构专业委员会在富春江水工机械厂,主持召开了关于龙羊峡水电站泄洪底孔平面链轮事故检修闸门和偏心铰弧形工作闸门技术鉴评会。出席会议的有有关设计、制造、施工及大专院校等33个单位的64位代表。由西北勘测设计院设计、富春江水工机械厂制造的链轮门和偏心铰弧门,设计水头均为120米,孔口
From May 25 to May 25, 1985, the Bureau of Hydraulic and Hydropower Construction, in conjunction with the Metal Structure Committee of China Hydropower Engineering Society, hosted the Fuchun River Hydraulic Machinery Factory and held the gate inspection on the spillway flushing spillway plane chain sprocket at the Longyangxia Hydropower Station Eccentric hinge arc work gate technical evaluation. Present at the meeting were 64 representatives of 33 units including design, manufacture, construction and tertiary institutions. Design by the Northwest Survey and Design Institute, Fuchunjiang Hydraulic Machinery Factory sprocket door and eccentric hinge arc door, the design head are 120 meters, the orifice
其他文献
自1982年胡耀邦总书记提出“积极发展小水电,建设100个农村电气化试点县”的号召以来,水利电力部在各省的积极支持下,经过调查研究,根据各地自然及经济条件,进行了选点,确定
为了改善淮河中上游的洪水预报和调度,水电部与意大利卡洛·洛蒂公司于1983年10月签订了淮河洪水预报和调度合作项目。这个项目包括在蚌埠设立计算机、预报调度中心;蚌埠至
本刊讯(记者王世赋)2月23日,云南省职业教育与成人教育专题会议在昆明召开。会议总结了2012年职成教育取得的成功经验,分析改革发展面临的新形势,对2013年的工作进行部署。会
勘测工作是水利水电规划设计的基础。没有可靠的勘测资料和科学的地质分析成果,就不可能作出一个好的规划设计。在水利水电工程建设中,勘测队伍又总是披荆斩棘,走在前面,常
AIM:The imaging features of MRI and DSA,using the modelsof implanted and induced hepatoma,were investigated in rats.METHODS:CBRH3 cancer cells were implanted f
企业信息化建设绝不是一个可以直接套用的工具,每个企业以其独具特色的企业环境和文化理念对信息化建设提出了不同的要求。文章以山西四建集团有限公司费用管理信息化为背景,
AIM:To evaluate the therapeutic efficiency of Tumor NecrosisFactor-related Apoptosis-inducing Ligand (TRAIL) gene onhuman colorectal cancer cell line HT29.METH
非工程措施的内容及分类,世界各国不尽相同。中国水利学会根据国内外的实践,1984年11月在北京召开的非工程防洪措施学术讨论会上认为,主要内容是:洪泛区管理、分洪滞
The c
美国威洛·克里克坝是世界上第一座用碾压混凝土建成的重力坝。该坝最大坝高为49米,顶长521米,混凝土方量31万米~3。由于美国陆军工程师团采用碾压混凝土施工方法,大坝全部
“汉字”俗称“方块字”。其字形的源头,可以追溯到良渚文化玉的造型。从岩画到陶文到玉器刻符,虽然还没有形成完整的词句,却为后来文字的形成做了铺垫,或者说,中国文字是多