在水电能源问题中,水库调度不论在水能设计阶段或运行阶段都是十分重要的问题,前者为在确定水库的调度原则,并在此基础上求得保证出力、多年平均发电量和水库调度图,同时为运行阶段的水库调度提供依据。这两者又是相互联系和制约的。本文主要讨论设计阶段的问题,提出了一种计算保证出力、发电量和设计调度图的方法,并编制了相应的电算程序。
In hydropower problem, reservoir dispatch is a very important issue both in the design phase and in the operation phase of hydropower. The former is to determine the reservoir dispatching principle, and on the basis of which the guaranteed output can be obtained. The average annual generating capacity and reservoir dispatch At the same time, provide the basis for reservoir operation in operation phase. These two are interconnected and restricted. This paper mainly discusses the design phase of the problem, put forward a method of calculating the output guarantee, generating capacity and design scheduling diagram, and the preparation of the corresponding computer program.