在工程实际中往往通过对网络计划时间参数的计算把握工期,本文对双代号网络计划的两种计算方式进行整理、比较,旨在提高学生的计算及应用能力。
In engineering practice, it is often through the calculation of network planning time parameters to grasp the duration, this article on the two-code network planning two kinds of calculation methods are collated, compared to improve students’ computing and application capabilities.