论文部分内容阅读
首先分析了轨道交通车辆段与综合基地的基本功能定位,并结合国外发展经验,针对我国城市用地紧张的客观背景,提出“优化布局、资源共享、综合开发”的设计理念。其次,以北京地铁7号线车辆段与综合基地为例,从功能定位、布局模式、工艺优化、资源共享、综合开发等方面,进行简要阐述。最后,对我国城市轨道交通车辆段与综合基地未来发展趋势进行展望。
First of all, it analyzes the basic functions of rail transit depot and comprehensive base. In combination with the experience of foreign countries, aiming at the objective background of urban land in our country, this paper puts forward the design concept of “optimizing layout, sharing resources and developing comprehensively”. Secondly, taking Beijing Metro Line 7 depot and comprehensive base as an example, this paper briefly elaborates the function positioning, layout mode, process optimization, resource sharing and comprehensive development. Finally, the prospect of the future development trend of depots and integrated bases for urban rail transit in our country is prospected.