重力坝的变位计算

来源 :浙江水利科技 | 被引量 : 0次 | 上传用户:skgoo1989
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、引言重力坝在承受各种荷载以后,坝体必将发生变位。变位的大小常为设计人员、施工人员以及管理人员所共同关心。重力坝是一空间结构。由于坝轴方向刚度很大,因此,沿坝轴方向的线位移以及绕水流方向的角位移很小,可以不计。这样,重力坝坝体截面的平均变位主要有竖向变位、绕竖向轴的扭转变位、水平变位和弯曲变位,其中又以水平变位及弯曲变位尤为重要。 I. INTRODUCTION After the gravity dam is under various loads, the dam body will be displaced. The size of the displacement often for designers, construction workers and managers of common concern. Gravity dam is a space structure. Due to the high stiffness in the direction of the dam axis, the linear displacement along the dam axis direction and the angular displacement in the direction of the water flow are negligible. In this way, the average displacement of gravity dam section is mainly vertical displacement, around the vertical axis of torsional displacement, horizontal displacement and bending displacement, of which horizontal displacement and bending displacement is particularly important.
其他文献
瑞灵顿广场10号一层的新房客布朗先生已着手清理厨房。这套公寓位于伦敦西区一个阴暗的死胡同里,现在确实需要修缮一新。他一手提着盛有洗涤液的水桶,一手拿着擦洗用的粗麻布
一、世界石油危机给我们的启示 1973年的石油涨价,导致世界经济转入缓慢发展(如表一)。79年第二次石油涨价后,各主要工业国采取强化节油措施,更有效地利用石油和代用能源来
机电排灌站的基本职能是提水排灌,为农业生产服务。排灌作业有显著的季节性,每年灌期只有六、七个月,大约六个月的非灌期以及灌期的间隙时间,排灌站可以充分利用自己的劳力
系统报道了未熟-低熟油同位素组成特征及其内涵.全油碳同位素可分为两组,一组主峰δ13C值为-30‰~-29‰,另一组主峰δ13C值为-27‰~-25‰,分别与湖泊相和盐湖或沼泽相环境相关.族组分间碳同位素分馏相
在喷射超临界水流条件下,作用在泄水底孔下游端棱锥形消力墩上的力主要取决于水的流速、消力墩高度等因素。本试验是在喷射超临界水流条件下进行的。模型的比尺为1∶50,模型
九曲水电站位于江西省定南县城东18公里的九曲河上,是一座径流式水电站。坝址控制流域面积1,080公里~2,多年平均流量28.8米~3/秒,设计水头14.5米,引用流量32米~3/秒,现已装
七月二十九日至三十一日,就近邀请参加山西省恒山水库运用鉴定会的外省专家十人,连同省内有关专家共二十余人,在太原参加了汾河水库增建7m泄洪洞泥沙计算咨询座谈会。 在对
文中把在农村林业经济中具有规模经营效应的组织形式划分为以龙头企业为主导模式和以合作组织为主导模式,分析了以龙头企业为主导模式的优势;通过建立企业与林农的博弈模型,
膀胱血管瘤临床上少见。我院近年来共发现 4例 ,行电气化切除治疗 ,疗效满意 ,现报告如下。1 资料与方法1 1 一般资料 :本组 4例 ,男 2例 ,女 2例 ,年龄 12~ 4 2岁 ,平均 2
陕西省水利水产会议于八六年四月八日——十五日在蒲城县召开。省委书记白纪年同志四月十三日专程到会,并作了重要讲话。白纪年同志首先肯定了陕西水利工作成绩。他说:解放