中央亚利桑那工程(以下简称 CAP)是由美国内务部下属的垦务局(以下简称 BOR)授权建造的,目前在美国国内最新也是最大的单项输水工程。该工程是从位于亚利桑那州东部边界的 LakeHavasu 提取科罗拉多河的河水,输送至亚利桑那中南部 Sonoran 沙漠地区的 Maricop、Pinal 和 Pima三个县。该项目于1968年开始工程规划设计,1973年正式开始土建,全部设计投资为37亿美元。
The Central Arizona Project (CAP) is the latest and largest single-unit water transfer project in the United States authorized by the Reclamation Bureau of the U.S. Department of the Interior (BOR). The project draws water from the Colorado River from Lake Havasu, located on the eastern border of Arizona, to three counties, Maricop, Pinal and Pima, in the Sonoran Desert in south-central Arizona. The project started its project planning and design in 1968 and formally started construction in 1973 with a total design investment of 3.7 billion U.S. dollars.