论文部分内容阅读
朱牛乡位于洛川高原东南部,原高沟深,水源缺乏,长期以来,农民“靠天吃饭”,人畜饮水全靠土窖蓄水,为改变这种状况,1977年10月朱牛乡在两水河兴建了一座扬程156米的抽水站,1982年主体工程竣工通水。三年以来这个站在综合经营方面取得比较好的经济效益,1983、1984两年共收入达4万元,其中利润1.8万元,初步实现了工资,管理经费自给有余。他们的主要做法是:
Zhu Niu Township is located in the southeastern Luochuan Plateau, the original high ditch deep, lack of water, for a long time, peasants “rely on the weather to eat,” people and livestock rely entirely on the pit water storage, in order to change this situation, October 1977 Zhu Niu Xiang A water pumping station with a head of 156 meters was built in Liangshuihe. In 1982, the main project was completed and the water was completed. In the past three years, this station has achieved comparatively good economic returns in integrated operation. In 1983 and 1984, the total revenue amounted to 40,000 yuan, of which the profit was 18,000 yuan. The initial wage was realized and the management fund was self-sufficient. Their main approach is: