论文部分内容阅读
1基本情况潘庄闸位于山东省齐河县境内的黄河左岸大堤上、设计引水流量100m3/s,加大流量120m3/s;1971年10月兴建,1980年8月改建竣工,运行至今。该问为钢筋混凝土箱式涵洞,3孔1联,共3联9孔,2台移动式启闭机,钢筋混凝土平板闸门,闸门是1980年改建时安装的新闸门,而闸
1 Basic Situation Panzhuang Gate is located on the left bank of the Yellow River in Qihe County, Shandong Province. It is designed with a diversion flow of 100m3 / s and a flow rate of 120m3 / s. Construction was completed in October 1971 and reconstruction was completed in August 1980. The question is reinforced concrete box culvert, a hole 3, a total of 3 9 holes, 2 mobile hoist, reinforced concrete slab gate, the gate is a new gate installed in 1980 reconstruction, and gate