澄碧河水库为多年调节水库,位于广西壮族自治区百色县城北7公里的右江支流澄碧河上。该工程于1958年8月动工兴建,1961年10月完成大坝填土,1966年春建成坝后式电站厂房并装机发电。水库控制流域面积2,000平方公里,土坝坝高70米,坝顶高程190米,总库容11.3亿立米。电站装机4台,每台容量6,500瓩,总容量26,000瓩,可供百色地区右江两岸农田提水灌溉用电、工矿企业及照明用电,是百色地区的主要电源之一。借助水
Chengbi River Reservoir for many years to regulate reservoirs, located in Guangxi Zhuang Autonomous Region, Baise 7 kilometers north of the Youjiang tributary of the river on the clear. The project was started in August 1958 to build, in 1961 October completed dam fill, spring 1966 construction of dam-type power plant and installed power generation. Reservoir control basin area of 2,000 square kilometers, earth dam height of 70 meters, crest elevation of 190 meters, the total storage capacity of 1.13 billion cubic meters. Four power stations are installed, each with a capacity of 6,500 瓩 and a total capacity of 26,000 瓩. It is capable of supplying farmland water for irrigation, industrial and mining enterprises and lighting electricity in the Beijiang River in the Baise area. It is one of the major power sources in Baise. With water