摘要:建筑工程造价控制是建筑工程建设管理工作的重要组成部分,只有加强建筑工程造价管理工作力度,提高建筑工程造价人员素质,才能使建筑工程造价管理走上国际化的道路.本文根据我国工程造价管理的现状,针对建筑工程造价控制的重要性,指出建筑工程造价控制应贯穿于项目的全过程,并分阶段的工程造价控制进行了探讨,以实现预期投资目标,充分发挥投资效益。
关键词:建筑工程;造价管理;造价控制
Abstract: The construction project cost control of building engineering construction management is an important part of the work, only to strengthen the cost management of construction engineering cost of construction work, improve the quality of personnel, in order to make the construction project cost management to go on the road of internationalization. This paper according to the engineering cost management in our country’s present situation, in view of the importance of cost control of building engineering, pointed out construction project cost control throughout the whole process of the project, and the phase of the project cost control are discussed, in order to achieve the desired objectives, give full play to the investment benefit.
Key words: construction engineering; cost management; cost control
中图分类号:TU723.3 文献标识码:A 文章编号:
1前言
工程造价的确定是一个非常复杂的过程,尤其在建筑工程上,其产品的多样性和复杂性,决定了计价方法的多样性和复杂性。特别是对于政府财政投资的项目来说,对工程造价的控制显得尤为重要,既要保证好建筑工程项目的建筑物高质量要求,又要采取严格及有效的措施合理控制工程造价。
2我国工程造价管理的现状
建筑工程造管理,就是运用科学技术原理和方法,在统一目标、各负其责的原则下,为确保建筑工程的经济效益和有关各方的经济权益所进行的对工程造价全过程、全方位的和符合政策及客观规律的全部业务行为和组织活动。在传统的计划经济时期建筑业不被视为是独立的物质生产部门,在建筑工程造价管理上,采用行政管理计划定价方式,因此,人们对工程造价管理没有足够的重视,建筑工程造价的确定往往是依据计划价格和行政规定进行编制。随着我国改革开放的发展和社会主义市场经济体制的建立,建筑工程的管理受到了极大的冲击,打开国门走出去,引进先进科学的管理模式,人们开始重新认识有关工程造价管理问题。由于我国实行的是概预算定额管理模式,普遍存在的问题是建筑工程造价难以客观真实地得到反映,概算超估算,预算超概算,决算超预算,突破计划投资的项目比比皆是。由于工程投资的确定缺乏科学合理性,导致工程实施中存在诸多问题。
3建筑工程造价控制贯穿于项目的全过程
建筑工程造价控制贯穿于项目的全过程,即项目决策阶段、项目设计阶段、项目工程招标阶段、项目实施阶段和项目竣工结算阶段都关系到建设项目的造价控制。下面就建筑工程各阶段的造价控制与管理做一简要分析。
3.1决策阶段的工程造价控制与管理
建设项目决策是选择和决定投资行动方案的过程,是对拟建项目的必要性和可行性进行技术经济论证、对不同建设方案进行技术经济比较选择及做出判断和决定的过程。项目决策对工程造价以及项目建成后的经济效益有着决定性的影响。建设项目决策阶段工程造价的控制涉及的行业较多,且包括诸多经验数据,工作量大,具体操作时参加的人员应由经济专家、市场分析专家、工程技术人员、土木工程师、企业管理人员、造价工程师、财会人员等组成,且必须具备一定的专业实践经验;必须保证数据的真实性、科学性、可靠性,从而保证造价的准确性和客观性。
3.2设计阶段的工程造价控制与管理
3.2.1建立必要的设计竞争机制,控制造价
改进和完善现行的设计方案招标办法,在方案评选时要求设计者提供方案设计概算,明确概算控制经济指标,将技术指标与经济指标有机地结合起来,将经济指标的权重适当提高,改变过去只重技术指标,忽视经济指标的评标办法。改革现行的设计取费标准,按造价计算设计取费的基数不超过限额设计的基数。在具体实施中可针对不同情况,制定相应的奖罚措施。
3.2.2优化设计方案,有效控制工程造价
通过优化设计方案来控制投资是一个综合性问题,进行投资控制并非一味地减少投资,而是要依据项目的具体情况进行平衡和调节,既要鼓励采用先进工艺和技术,又要防止投资扩大和超出。最好的方案不一定是造价最低的方案,不能片面强调节约投资,好的设计方案不仅应该技术先进、功能优越,而且其投资要有最优的性能价格比。
3.3招标阶段的工程造价控制与管理
3.3.1科学合理地编制标底
标底是建设单位拟建工程投资的底数。单位没有条件,应请有资格的咨询单位代编;有条件的单位尽量自行编制。编制标底时要与市场的实际变化相吻合,要实事求是、切合实际,保证标底编制质量,把工程标底控制在合理造价的下限。
3.3.2确定适合的发包方式
业主可根据工程的规模、性质、特点,确定合适的发包方式来控制工程造价。当然,不管采用哪种发包方式都应该进行招标,引进竞争机制,使各施工方在保证最低的企业利润情况下,报出非常优惠的价格,杜绝议标或变相议标。实践证明,凡是先开工后定价的工程多半造价偏高。
3.3.3制定严密的招标文件,公平竞争,合理招投标
实行公平合理的招投标,可使承担的工程造价更加合理,并可有效地控制工程造价。所以在招投标过程中,要有明确的透明度,使招投标单位思想明确,对招投标工作放心,真正体现市场经济的公平竞争。
3.3.4慎重地选择施工队伍
必须根据工程规模、技术要求,认真挑选施工单位。对于一些较大而又复杂的重要工程,应选择技术、资金、施工力量雄厚的施工企业,对一些中小型项目则可选择小的施工企业,这样可避免大的公司报价高、搞小型项目在工程质量上不被重视的情况。
3.4项目实施阶段的工程造价控制与管理
3.4.1施工中设计变更的控制
建设单位、设计单位和施工单位在开工前认真审核设计图纸,严格遵守设计规范,把可能在施工中出现的问题,在图纸会审阶段进行解决,避免在施工过程中影响工程进度和质量,或发生返工等现象,造成不必要的人力、物力和财力的浪费。
3.4.2认真对待索赔与反索赔
索赔是指在合同履行过程中对于并非自己的过错,而应由对方承担责任的情况造成的实际损失向对方提出经济补偿的要求l5 J,它是工程施工中发生的正常现象。建设单位反索赔的主要内容有:工期延误、施工缺陷、业主合理终止合同或承包商不正当放弃施工等。
3.4.3工程进度款的支付
工程进度款的支付也是施工阶段造价管理的一个重要内容,我国现行支付方法常见的有:按月支付、分段支付、竣工后一次支付等。无论实行何種支付方式,结算的条件都应该是质量合格、符合合同条件、变更单签证齐全,特别是要实行质量一票否决权制度,不合格的工程决不付款。
3.5竣工结算阶段的工程造价控制与管理
竣工决算这最后一道关口的主要目的就是促进建设单位强化管理意识、完善管理制度、改进管理方法等,使工程建设投资达到最佳的经济性、效率性、效果性。审计人员必须秉公办事,坚持原则,从严把关。工作中应坚持深入施工现场,了解工程变更内容的具体做法,熟悉工程变更、增减工程量情况,为决算审计打下基础,同时要建立严格的审计制度。只有坚持严格的办法和程序,才能保证决算的真实性、严肃性。
4结语
由此可见,工程造价的控制与管理是一个从投资决策到竣工决算的全过程管理,任何环节都缺一不可。为了实现预期投资目标,充分发挥投资效益,只有对建筑工程进行全过程造价控制才能达到目的。控制工程造价不仅仅是防止投资突破限额,更积极的意义是要促进建设、施工、设计单位加强管理,使人力、物力、财力等有限的资源得到充分的利用,取得最佳的经济效益和社会效益。因此,做好工程造价的控制与管理工作,对保证和加速经济发展具有重要意义。
参考文献
[1]宋培杰.《青岛工程造价信息》,2005(15):21-23.
[2]尹怡林:《工程造价相关知识》,天津大学出版社,2004.
[3]李勇:《建筑施工企业安全文化的建设》,《建筑经济》,2007年第6期.
[4]孙光:《建筑施工企业安全文化建设思考》,《山西建筑》,2008年第10期.
[5]张海贵.现代建筑施工项目管理[M],北京,金盾出版社,2003.
关键词:建筑工程;造价管理;造价控制
Abstract: The construction project cost control of building engineering construction management is an important part of the work, only to strengthen the cost management of construction engineering cost of construction work, improve the quality of personnel, in order to make the construction project cost management to go on the road of internationalization. This paper according to the engineering cost management in our country’s present situation, in view of the importance of cost control of building engineering, pointed out construction project cost control throughout the whole process of the project, and the phase of the project cost control are discussed, in order to achieve the desired objectives, give full play to the investment benefit.
Key words: construction engineering; cost management; cost control
中图分类号:TU723.3 文献标识码:A 文章编号:
1前言
工程造价的确定是一个非常复杂的过程,尤其在建筑工程上,其产品的多样性和复杂性,决定了计价方法的多样性和复杂性。特别是对于政府财政投资的项目来说,对工程造价的控制显得尤为重要,既要保证好建筑工程项目的建筑物高质量要求,又要采取严格及有效的措施合理控制工程造价。
2我国工程造价管理的现状
建筑工程造管理,就是运用科学技术原理和方法,在统一目标、各负其责的原则下,为确保建筑工程的经济效益和有关各方的经济权益所进行的对工程造价全过程、全方位的和符合政策及客观规律的全部业务行为和组织活动。在传统的计划经济时期建筑业不被视为是独立的物质生产部门,在建筑工程造价管理上,采用行政管理计划定价方式,因此,人们对工程造价管理没有足够的重视,建筑工程造价的确定往往是依据计划价格和行政规定进行编制。随着我国改革开放的发展和社会主义市场经济体制的建立,建筑工程的管理受到了极大的冲击,打开国门走出去,引进先进科学的管理模式,人们开始重新认识有关工程造价管理问题。由于我国实行的是概预算定额管理模式,普遍存在的问题是建筑工程造价难以客观真实地得到反映,概算超估算,预算超概算,决算超预算,突破计划投资的项目比比皆是。由于工程投资的确定缺乏科学合理性,导致工程实施中存在诸多问题。
3建筑工程造价控制贯穿于项目的全过程
建筑工程造价控制贯穿于项目的全过程,即项目决策阶段、项目设计阶段、项目工程招标阶段、项目实施阶段和项目竣工结算阶段都关系到建设项目的造价控制。下面就建筑工程各阶段的造价控制与管理做一简要分析。
3.1决策阶段的工程造价控制与管理
建设项目决策是选择和决定投资行动方案的过程,是对拟建项目的必要性和可行性进行技术经济论证、对不同建设方案进行技术经济比较选择及做出判断和决定的过程。项目决策对工程造价以及项目建成后的经济效益有着决定性的影响。建设项目决策阶段工程造价的控制涉及的行业较多,且包括诸多经验数据,工作量大,具体操作时参加的人员应由经济专家、市场分析专家、工程技术人员、土木工程师、企业管理人员、造价工程师、财会人员等组成,且必须具备一定的专业实践经验;必须保证数据的真实性、科学性、可靠性,从而保证造价的准确性和客观性。
3.2设计阶段的工程造价控制与管理
3.2.1建立必要的设计竞争机制,控制造价
改进和完善现行的设计方案招标办法,在方案评选时要求设计者提供方案设计概算,明确概算控制经济指标,将技术指标与经济指标有机地结合起来,将经济指标的权重适当提高,改变过去只重技术指标,忽视经济指标的评标办法。改革现行的设计取费标准,按造价计算设计取费的基数不超过限额设计的基数。在具体实施中可针对不同情况,制定相应的奖罚措施。
3.2.2优化设计方案,有效控制工程造价
通过优化设计方案来控制投资是一个综合性问题,进行投资控制并非一味地减少投资,而是要依据项目的具体情况进行平衡和调节,既要鼓励采用先进工艺和技术,又要防止投资扩大和超出。最好的方案不一定是造价最低的方案,不能片面强调节约投资,好的设计方案不仅应该技术先进、功能优越,而且其投资要有最优的性能价格比。
3.3招标阶段的工程造价控制与管理
3.3.1科学合理地编制标底
标底是建设单位拟建工程投资的底数。单位没有条件,应请有资格的咨询单位代编;有条件的单位尽量自行编制。编制标底时要与市场的实际变化相吻合,要实事求是、切合实际,保证标底编制质量,把工程标底控制在合理造价的下限。
3.3.2确定适合的发包方式
业主可根据工程的规模、性质、特点,确定合适的发包方式来控制工程造价。当然,不管采用哪种发包方式都应该进行招标,引进竞争机制,使各施工方在保证最低的企业利润情况下,报出非常优惠的价格,杜绝议标或变相议标。实践证明,凡是先开工后定价的工程多半造价偏高。
3.3.3制定严密的招标文件,公平竞争,合理招投标
实行公平合理的招投标,可使承担的工程造价更加合理,并可有效地控制工程造价。所以在招投标过程中,要有明确的透明度,使招投标单位思想明确,对招投标工作放心,真正体现市场经济的公平竞争。
3.3.4慎重地选择施工队伍
必须根据工程规模、技术要求,认真挑选施工单位。对于一些较大而又复杂的重要工程,应选择技术、资金、施工力量雄厚的施工企业,对一些中小型项目则可选择小的施工企业,这样可避免大的公司报价高、搞小型项目在工程质量上不被重视的情况。
3.4项目实施阶段的工程造价控制与管理
3.4.1施工中设计变更的控制
建设单位、设计单位和施工单位在开工前认真审核设计图纸,严格遵守设计规范,把可能在施工中出现的问题,在图纸会审阶段进行解决,避免在施工过程中影响工程进度和质量,或发生返工等现象,造成不必要的人力、物力和财力的浪费。
3.4.2认真对待索赔与反索赔
索赔是指在合同履行过程中对于并非自己的过错,而应由对方承担责任的情况造成的实际损失向对方提出经济补偿的要求l5 J,它是工程施工中发生的正常现象。建设单位反索赔的主要内容有:工期延误、施工缺陷、业主合理终止合同或承包商不正当放弃施工等。
3.4.3工程进度款的支付
工程进度款的支付也是施工阶段造价管理的一个重要内容,我国现行支付方法常见的有:按月支付、分段支付、竣工后一次支付等。无论实行何種支付方式,结算的条件都应该是质量合格、符合合同条件、变更单签证齐全,特别是要实行质量一票否决权制度,不合格的工程决不付款。
3.5竣工结算阶段的工程造价控制与管理
竣工决算这最后一道关口的主要目的就是促进建设单位强化管理意识、完善管理制度、改进管理方法等,使工程建设投资达到最佳的经济性、效率性、效果性。审计人员必须秉公办事,坚持原则,从严把关。工作中应坚持深入施工现场,了解工程变更内容的具体做法,熟悉工程变更、增减工程量情况,为决算审计打下基础,同时要建立严格的审计制度。只有坚持严格的办法和程序,才能保证决算的真实性、严肃性。
4结语
由此可见,工程造价的控制与管理是一个从投资决策到竣工决算的全过程管理,任何环节都缺一不可。为了实现预期投资目标,充分发挥投资效益,只有对建筑工程进行全过程造价控制才能达到目的。控制工程造价不仅仅是防止投资突破限额,更积极的意义是要促进建设、施工、设计单位加强管理,使人力、物力、财力等有限的资源得到充分的利用,取得最佳的经济效益和社会效益。因此,做好工程造价的控制与管理工作,对保证和加速经济发展具有重要意义。