【摘 要】
:
In the goal optimization and control optimization process the problems with common artificial neural network algorithm are unsure convergence, insufficient post-training network precision, and slow training speed, in which partial minimum value question t
【机 构】
:
Department of Electrical Engineering, Liaoning Technical University, Fuxin 123000, China
论文部分内容阅读
In the goal optimization and control optimization process the problems with common artificial neural network algorithm are unsure convergence, insufficient post-training network precision, and slow training speed, in which partial minimum value question tends to occur. This paper conducted an in-depth study on the causes of the limitations of the algorithm, presented a rapid artificial neural network algorithm, which is characterized by integrating multiple algorithms and by using their complementary advantages. The salient feature of the method is self-organization, which can effectively prevent the optimized results from tending to be partial minimum values. Overall optimization can be achieved with this method, goal function can be searched for in overall scope. With optimization control of coal mine ventilator as a practical application, the paper proves that by integrating multiple artificial neural network algorithms, best control optimization and goal optimized can be achieved.
其他文献
A rational evaluation on an investment project forms the basis of a right investment decision-making. The discounted cash flow (DCF for short) method is usually used as a traditional evaluation method for a project investment. However, as the mining inves
A short review for the existing various driving methods for belt conveyor was given, which include the analysis and comparison about the advantages, disadvantages and suitable application range of these methods. Based on this the variable-frequency-contro
The authors looked upon it as real options and applied the VaR(Value at Risk) method to the evaluation of its risk value based on the analysis of R & D project investment characteristics,and advanced the evaluation model of the project\'s return and ris
On the basis of the analysis of classical stock model, according to th e limitation of the model, the article puts forward the revision of classical mo del and enforces the applicability of the stock model.
The truss cable support technology was put forward to control the large mining height and composite mudstone strata roadway. This technique makes the steady rock in roadway slantwise top be anchor points, makes the truss cable be steady support structure
According to the evolving principle of the organic and environment, firstly, for the purpose of growing and keeping the ground, some legume species were chosen as pioneer plants to improve the construction of soil and increased soil fertility in the light
The fully mechanized caving coal mining under the railway in mine area will result in difficulty maintenance of railway because of great distortion and subsidence speed of terrene and railway. If the subsidence forecasting is incorrect and maintenance mea
In this paper, the course of the filtration is analyzed.In order to study the filtration efficiency of the filter material, the computer program was edited.According to the results of the computer program, some important parameters of the filter material
Fault diagnosis expert system for hydraulic support is studied.The system is achieved by Turbo-prolong Language, it summaries the experience of the domain expert and sets up a fault tree, knowledge base is developed by a productive rule.According to the f
Based on the equation of the gas flow continuity and state, Darcy law and Langmuir equation, the law of methane seepage in the wall of drainage roadway was studied. The governing equation of methane one-way seepage in the seam was founded.By solving the e