论文部分内容阅读
印度Nathpa-Jhakri水电工程位于Satluj河上,装机容量1500MW,地下厂房安装6台250MW立轴混流式水轮机发电机组,详述了电站采用的机电设备。
The Nathpa-Jhakri hydroelectric project in India is located on the Satluj River with an installed capacity of 1,500 MW. Six 250 MW vertical-axis Francis turbines are installed in the underground plant, detailing the electromechanical equipment used in the plant.