论文部分内容阅读
<正>Till October 9, 2011 the 5000 m3/d commercial methana-tion coal-to-gas pilot unit designed by the National CleanEnergy Laboratory of the CAS Dalian Institute of Chemi-cal Physics (DICP) has been operating smoothly for morethan 1 000 h at the Hena