论文部分内容阅读
黄河下游堤防岁修、防汛需用大批料物,这些料物主要靠航运力量运输。为了保证岁修、防汛物资的供应,去年由山东、河南两省河务局建造了一批船舶,计山东河务局建造载重80吨铁驳15艘,拖轮一艘;河南河务局建造载重80吨铁驳10艘、载重60吨木船9只,拖轮两艘,总载重量2,540吨。这些驳船将全部由拖轮带动。山东河务局于1963年建成投入生产,经试用效果良好,装125匹马力柴油机的拖
The embankment of the lower reaches of the Yellow River is undergoing years of repair and flood control needs large quantities of materials which are mainly transported by shipping forces. In order to ensure the supply of annual maintenance and flood control materials, last year, a batch of ships were built by Shandong and Henan Provincial Bureau of Rivers, counting 15 tons of iron barges and one tugboat carrying 80 tons of load. The Henan River Bureau built a load of 80 Ton iron barge 10, carrying 60 tons of wooden boats 9, two tugboats, the total carrying capacity of 2,540 tons. These barges will all be driven by tugboats. Shandong River Bureau completed in 1963 put into production, the trial results are good, equipped with 125 horsepower diesel drag