炼钢主厂房转炉脱气跨是八层钢框架结构,框架的组成构件种类多,节点新颖,校正工艺复杂。主要参数如下: 框架尺寸跨度10米+13米=23米,全长172米高度70米轴线占地面积 3956米~2
The degassing span of the main steel plant of the steel-making plant is an eight-story steel frame structure. The types of components of the frame are numerous, the nodes are novel and the calibration process is complex. The main parameters are as follows: Frame size span 10 meters + 13 meters = 23 meters, a total length of 172 meters height 70 meters axis area 3956 meters ~ 2