1993年,在水利部的领导下,经过流域4省人民的共同努力,治淮的攻坚战已初见成效。主要表现在治淮骨干工程前期工作滞后的局面已扭转和工程建设有了突破性进展。 东调南下、石漫滩水库等主要工程项目的可研报告已经批复。怀洪新河、白莲崖水库、
In 1993, under the leadership of the Ministry of Water Resources, the storming battle of the Huai River basin has achieved initial success through the concerted efforts of the four peoples in the basin. Mainly reflected in the situation of lagging behind in the work of treating key projects in the early stage of Huaihe River has been reversed and a breakthrough has been made in engineering construction. Eastward transfer south, Shi Manan reservoir and other major projects of feasibility study report has been approved. Huai Hong River, White Lotus Cliff Reservoir,