在没有进行设备改造的条件下 ,张家口发电厂对其 3台国产 30 0 MW机组进行了 4 0 %额定负荷调峰试验 ,取得了成功 ,摸索出了适合国产30 0 MW机组低负荷调峰运行的方法。
In the absence of equipment modification, Zhangjiakou Power Plant made 40% of its rated load on 40 sets of domestically produced 30 0 MW units and achieved success, and found out that it is suitable for peak load operation of domestic 30 MW units under low load Methods.