论文部分内容阅读
本文应用多目标动态规划理论,提出了露天矿分期开来采剥关系多目标动态优化方法。该方法是露天矿分期开采来剥关系优化理论的进一步推广。
In this paper, multi-objective dynamic programming theory is applied to propose a multi-objective dynamic optimization method for mining open-pit mining. The method is exploited by staged mining in open pit to strip the relationship optimization theory.