论文部分内容阅读
三峡工程大江截流是目前世界上截流流量最大,水深最大的截流工程。其中,有许多技术难题需要解决。由于大江截流的特殊性及重要性,施工期河势边界、水流流态异常复杂,致使常规数学模型计算分析受到限制。为此,物理模型试验研究成为解决大江截流设计及施工中有关问题的主要手段。研究成果为大江胜利实现截流打下了坚实基础。 The closure of the Three Gorges Project is the largest river closure flow in the world, the largest water depth closure project. Among them, there are many technical problems to be solved. Due to the particularity and importance of the river closure, the river flow boundary during the construction period has an extremely complicated water flow pattern, which limits the calculation and analysis of conventional mathematical models. Therefore, the physical model test has become the main method to solve the problems in the design and construction of the main river closure. The research results laid a solid foundation for the victory of the Grand River to achieve closure.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
【摘要】深基坑工程是建筑工程施工过程中十分重要的一部分,其施工质量的好坏直接关系到了整体建筑的稳定与安全。因此,在施工的过程中应该根据现场的实际情况,科学的设计和优化施工方案,然后在方案的指导下,严格执行操作,加强施工过程的监管,确保基坑的稳定,从而提高建筑工程的质量。本文从建筑工程中深基坑中支护施工技术进行简要分析,希望能给大家带来一些参考。  【关键词】建筑工程;深基坑;支护施工;技术要点  
期刊