重庆站又名菜园坝站,为全国铁路客运一等站。车站建于1952年,占地面积25万平方米,设置4座站台、7股到发线。车站布局为纵列式,分为到发场、交接场、调车场。在2006年10月22日龙头寺的重庆北站启用后,重庆站的功能逐渐被取代。重庆站每天承担的客运任务是28对列车,主要方向是渝黔线、成渝线、渝怀线等,其繁忙程度,已低于重庆北站。重庆站与重庆北站、重庆西站(在建)共同组成重庆铁路枢纽“三主两辅”客运系统的三大主客运站。目前,重庆站正在设计改造方案,未来完成改造后,
Chongqing Railway Station, also known as Caiyuanba Station for the National Railway Passenger Station. The station was built in 1952, covers an area of 250,000 square meters, set up four platforms, 7 shares to the hair line. Station layout for the column type, divided into the hair market, hand over the site, shunting yard. After the opening of Chongqing North Railway Station on the 22nd of October 2006, the function of Chongqing Station was gradually replaced. Chongqing Railway Station daily passenger task is to undertake 28 pairs of trains, the main direction is the Yu-Qian line, Chengdu-Chongqing line, Yu Huai line, the busy level, has been lower than Chongqing North Station. Chongqing Railway Station and Chongqing North Railway Station, Chongqing West Railway Station (under construction) together constitute the Chongqing Railway Terminal “three main two auxiliary ” passenger system of the three main passenger terminal. At present, Chongqing Station is designing and transforming the plan. After the completion of the transformation in the future,