论文部分内容阅读
本文介绍了前湖电排站深井井点降水工程的设计计算和施工概况。整个降水过程是顺利的,基础开挖完全在疏干的基坑环境下进行,达到了预期目的。
This paper introduces the design and calculation of the deep well dewatering project of Qianhu Pumped Storage Station and its construction overview. The entire precipitation process is smooth, foundation excavation completely dredged pit environment, to achieve the desired purpose.