论文部分内容阅读
在矿场实际资料的基础上,分析了杏树岗油田南部(以下称杏南)更新注水井的吸水能力,结合室内实验资料,指出了影响更新井吸水能力的主要因素及改善更新井吸水能力的途径。
Based on the actual data of the mine, the water absorption capacity of the new injection wells in the Xingshugang oilfield was analyzed. Based on the laboratory data, the main factors affecting the water absorption capacity of the new wells and the water absorption capacity of the newer wells were pointed out Way.