论文部分内容阅读
介绍了莱钢烧结厂 2台 10 5m2 烧结机自投产以来进行的主要设备改造及其效果。
The main equipment reformation and its effect of 2 sets of 10 5m2 sintering machines in Laigang Sintering Plant have been introduced.