论文部分内容阅读
我处在涟邵矿区冷水江煤矿塘冲矿井主平峒掘进中,采用了江西矿山机械厂生产的S8D型梭式矿车,青海矿山机械厂生产的ZP-60型液压耙斗装岩机,湘潭电机厂生产的5吨防爆特殊型电机车,组成了装运机械化作业线(图1),自1983年10月中旬开始,4个月成巷532米,其中10月60米,11月122米,12月170米,84年1月180米,装运矸石量约1.5万米~3,在较短的使用时间内,梭式矿车显现出良好的特性。
I was in Liangshao mining area coal mine Tongchuang mine main flat 峒 tunneling, the use of the Jiangxi Mining Machinery Factory S8D shuttle car, Qinghai Mining Machinery Factory ZP-60 hydraulic rake bucket rock loader, Xiangtan Motor Factory 5 tons of explosion-proof special-type electric locomotive, the composition of the transport mechanization operation line (Figure 1), since mid-October 1983, 4 months Lane 532 meters, of which 60 meters in October, 122 meters in November , 170 meters in December and 180 meters in January of 1984, loading about 15,000 meters of waste rock. In a short period of use, the shuttle car showed good characteristics.