论文部分内容阅读
1 汛期到来之前,对配电变压器台架基础应及时进行培土,防止因基础周围存水而引起的基础下陷造成配电变压器本体倾斜或落地的事故.
Before the arrival of the flood season, the base of distribution transformers should be timely cultivated so as to prevent accidents such as tilting or landing of the main body of the distribution transformer caused by the subsidence caused by the storage of water around the base.