石灰石质量中和工作

来源 :北京矿业学院学报 | 被引量 : 0次 | 上传用户:jianqing3232
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
甘井子矿为一大型露天石灰石矿。生产过程全部机械化。它的产品,主要供应给鞍钢作冶炼熔剂。由于冶炼生产对矿石质量的要求,矿山中产生了质量中和问题。所谓“质量中和”,就是通过地质、设计、计划和生产操作的一系列工作,将矿体中含CaO,SiO_2高低不均的Ⅰ、Ⅱ级品矿石互相混匀。使其CaO,SiO_2的含量达到理论计算的平均品位。三年来,矿山在这一方面做了一些工作,也取得了一定的成绩:矿石产品质量全部达到了冶炼的要求。 Ganjingzi mine is a large opencast limestone mine. All mechanized production process. Its products are mainly supplied to Angang for smelting flux. As the smelting production of ore quality requirements, the mine has produced a problem of quality and. The so-called “quality and” is through geological, design, planning and production operations of a series of work, the ore body containing CaO, SiO2 uneven grade Ⅰ, Ⅱ grade ore mixed with each other. So that the CaO, SiO 2 content reached the theoretical average grade. In the past three years, the mine has done some work in this respect and has also made some achievements. The quality of ore products has all met the requirements of smelting.
其他文献
云南省漫湾水电站是澜沧江梯级开发的第一期工程,装机容量5×25万kW,是百万千瓦级大型水电站中第一个实行中央和地方合资建设的项目。工程于1985年9月开始施工准备, Manwan
根据水利部水人劳[1991]88号文的批复,“水利部科技推广中心”筹备工作业已完成,自1991年8月7日起启用新印章,正式开展工作。水利部科技推广中心是部属独立的事业单位,主 A
2013年3月26日至27日,2012年度证券评估资格资产评估机构执业质量检查总结会议在京召开。财政部检查工作领导小组副组长、企业司副司长肖雪峰和中评协副秘书长卞荣华出席会议
中文的方位短语主要可以由前饰词(如,以、之)与后缀词(如,边、面、头)组合而成,结合了明确的方向指引(如,前后、上下、左右、里外等)。这样的组成会避免在实际使用上不存在的
创建于1982年,历经33年,从一所普通中学发展而来的北京市丰台区职业教育中心学校(下文简称“丰职”),如今已经发展成为一校多址的规模化、质量化、集团化的优质中等职业学校
呼和浩特是内蒙古自治区首府,建城已有400多年的历史。呼和浩特为蒙古语音意为青色的城。其地位于内蒙古的中南部,地处晋北山地与蒙古高原之间,是一个面积约15000多平方公里的环
We give a brief introduction of developments of seismic methods in the studies of marine gas hydrates. Then we give an example of seismic data processing for B
江苏省滨海中等专业学校,系江苏省四星级暨高水平示范性中等职业学校,江苏省高水平现代化职业立项学校。校园占地115.9亩,建筑面积55 767.76平方米,教学实验实习设备2 000多
右派分子知道在党领导下几年来地质勘探工作成绩是巨大的,是难以否定的,因而转向攻击地质理论水平。右派分子以为这一下算抓到了共产党的“弱点”,企图以此否定成绩来达到他
(一) 改造挖潜势在必行雅安地区太平二级水电站投产于50年代初期。发电机是德国西门子公司40年代的产品,装机容量300kW,水轮机紧固件为英制。经过四十年的运行,发电机绝缘老