论文部分内容阅读
近年来,许多有关水资源工程的技术文献都涉及到数学模型在规划、设计和调度中的应用.这些论文着眼于推导新的模型公式、改进求解方法和提高计算效率,但由于偏重理论分析而受到工程技术人员的批评.当前,数学模型的实际应用状况如何,存在哪些问题,如何加以改进,已成为人们普遍关注的问题.奥斯汀(T.AL.Austin)教授就上述问题对美国有关水资源工程的102个州立机构和39个私人咨询机构进行了调查,现将其结果摘编如下,供有关同志们参考.
In recent years, many technical literature on water resources engineering involves the application of mathematical models in planning, design and scheduling.These papers focus on deriving new model formulas, improving solving methods and improving computational efficiency. However, due to the emphasis on theoretical analysis Has been criticized by engineering and technical personnel.At present, the mathematical model of the actual application of the situation, what are the problems, how to improve, has become a common concern.Austin (Professor T.AL.Austin) on the above issues on the United States on water resources The investigation of the 102 state agencies and 39 private advisory bodies of the project is now summarized below for reference by the relevant comrades.