安东一次变电所是在1958年1月投入运行的。全所职工在大跃进的鼓舞下,鼓足干劲,力争上游,认真贯彻安全生产的方针,刻苦学习,集体钻研,大搞培训,健全管理,加强检修,消除缺陷,从而自开始运行到现在保持了1,100多天安全运行无事故。同时积累了一套较完整的运行管理经验。
The Anton substation was put into operation in January 1958. With the encouragement of the Great Leap Forward, all the staff of the company encouraged them to work hard, strived for the upper reaches, conscientiously implemented the guideline of safe production, studied assiduously, studied collectively, carried out extensive training, improved management, strengthened inspections, and eliminated defects, and thus maintained the operation since its inception. More than 1,100 days of safe operation without incident. At the same time, it has accumulated a relatively complete set of operational management experience.