韦利基克里韦利(VelikiKrivelj)工程是一个年开采和处理1250万t铜矿石的铜矿和选厂,它位于南斯拉夫联邦共和国塞尔维亚东北的博尔附近。用标准浮选法生产铜精矿,每天需要大约13~14.5万m‘的水,其中85%~95%的水是从尾矿地回收的。尾矿坝的设计、施工和运行正日益得到?
The VelikiKrivelj project is a copper mines and processing plant that annually mines and processes 12.5 million tons of copper ore, located near Bor in northeast Serbia in the Federal Republic of Yugoslavia. The production of copper concentrates by standard flotation processes requires about 130,000-145,000 m³ of water per day, of which 85-95% of the water is recovered from the tailings. Tailings dam design, construction and operation are getting?