在刚刚过去的2000年,河南省电力勘测设计院总产值突破8000万大关,达到8704元,比上年增加35.3%。创造了该院最高的历史记录。 坚持经济建设第一,求真务实的工作思路,是该院创造8000万元历史最高记录的重要经验。在发电项目减少的情况下,该院紧紧抓住三峡外送、小浪底外送输变电工程多的机遇,积极参与电力设计市场竞争,在大型电力建设项目的招投标中连连取胜。上年通过部标,该院先后夺得南开线、新濮线500千伏线路工程设计资格和郑西开关站、濮阳变两个500千伏变电站项目;2000年在竞争中又夺得郑开线500千伏路
In the past 2000, the total output value of Henan Electric Power Survey and Design Institute exceeded 80 million, reaching 8704 yuan, an increase of 35.3% over the previous year. Created the highest historical record of the hospital. Adhering to the economic construction first and seeking practical and pragmatic work ideas are the important experiences for the hospital to create a record of 80 million yuan in history. With the reduction of power generation projects, the institute has seized the opportunities of the Three Gorges Delivery Project and the Xiaolangdi Exported Power Transmission Project, actively participated in the power design market competition, and won successively in the bidding of large-scale power construction projects. In the previous year, the department won the bid for the 500 kV line engineering design qualification of the Nankai Line and Xinyi Line and the two 500 kV substation projects of Zhengzhou Switching Station and Xiangyang Substation. In 2000, it won Zheng Kai in the competition. 500 kV line