论文部分内容阅读
山体绿化对象多为坡面较陡的山体。由于坡面陡峭、地质坚硬,常规绿化无济于事。我们在沈阳农业开发区1.2万平方米裸露山体绿化工程中引进了客土固化技术,使近90度的陡直峭壁上的植物快速返青,成活率高,生长期长,在岩面上形成坚固的保护层,能抵御自然冲刷和侵蚀。工程施工10天后,草种出苗,30天后灌木出苗,山体基本覆绿。养护期间遇到沈阳主汛期,经历了18天的中到大雨,覆绿后的山体未受雨水影响,草坪、灌木长势良好。
Mountain green objects are mostly steep slopes of the mountain. Due to the steep slopes, the geology is hard and the conventional greening is of no avail. We introduced guest soil curing technology to 12,000 square meters of exposed mountain greening project in Shenyang Agricultural Development Zone so that plants on steep cliffs nearly 90 degrees quickly rejuvenated with high survival rate and long growth period and strong formation on the rock face The protective layer, to resist erosion and erosion. After 10 days of construction, the grass seeds emerge, and the shrubs emerge after 30 days. The mountain basically covers the green. Shenyang encountered during the main flood season, experienced 18 days of moderate to heavy rain, green after the mountain is not affected by the rain, lawn, shrubs are in good condition.